Scientific Program |
|
|
International Symposium on Vacuum Science & Technology |
and its Application for Accelerators (IVS-2012) |
February 15-17, 2012 |
Variable Energy Cyclotron Centre |
|
|
Tuesday, Feb 14, 2012 |
|
Session 1 (Plenary) |
|
IT - 01 |
Vacuum Systems of Accelerators at Indus Complex |
|
S. K. Shukla, Raja Ramanna Centre for Advanced Technology, Indore |
|
|
IT - 02 |
Experience with first full year of LHC operation |
|
G. Bregliozzi, et.al, CERN, CH - 1211 Geneva 23 |
|
|
IT - 03 |
Vacuum System of the Large Cyclotrons at VECC |
|
Gautam Pal, VEC Centre, Kolkata |
|
|
Session 2 (Plenary) |
|
IT - 04 |
Operational experience and upgrade of the TRIUMF cyclotron vacuum system |
|
Y. Bylinski, D. Yosifov, TRIUMF, Canada |
|
|
IT - 05 |
Recent Developments in RIKEN RI-Beam Factory |
|
Osamu Kamigaito, Accelerator Group, RIKEN Nishina |
|
|
IT - 06 |
Vacuum system at IUAC |
|
A. Mandal, Inter University Accelerator Centre, New Delhi |
|
|
IT - 07 |
Superconducting heavy ion LINAC booster at the TIFR. |
|
R. G. Pillay, Tata Institute of Fundamental Research, Mumbai |
|
|
Parallel Session 3A |
|
Oral 01 |
Design, fabrication, and performance testing of a vacuum chamber for pulse compressor of a 150 TW Ti:sapphire laser |
|
P. K. Tripathi, et.al., RRCAT,Indore |
|
|
Oral 02 |
Design, Installation and Commissioning of new Vacuum Chamber for Analysing Magnet of K-130 Cyclotron |
|
Bidhan Ch. Mandal, et.al., VECC, Kolkata |
|
|
Oral 03 |
Vacuum Brazing of Accelerator Components |
|
Rajvir Singh, et.al., RRCAT,Indore |
|
|
Oral 04 |
Design and construction of a target chamber and associated equipments for the BARC Charged Particle Detector Array |
|
Bency John Vilavinal, et.al., Bhabha Atomic Research Centre |
|
|
Oral 05 |
Influence of Wall Conditioning on ADITYA Plasma Discharges |
|
R. L. Tanna, et.al., Institute for Plasma Research, Bhat, Gandhinagar, Gujarat |
|
|
Oral 06 |
K-130 Cyclotron Vacuum System |
|
R. C. Yadav, et.al., VECC, Kolkata |
|
|
Parallel Session 3B |
|
Oral 07 |
Multipurpose Vacuum Induction Processing System |
|
M, Govindaraju, et.al., NFTDC, Hyderabad |
|
|
Oral 08 |
Fabrication of Niobium Superconducting Accelerator Cavity by Electron Beam Welded Joints |
|
Tanmay K. Saha, et.al., Bhabha Atomic Research Centre |
|
|
Oral 09 |
Study on Condensation and Recycle of Liquid Metal in Vacuum |
|
Jaya Mukherjee, et.al., Bhabha Atomic Research Centre |
|
|
Oral 10 |
Broadband Antireflection Coating on Zincsulphide Window for Shortwave Infrared cum Night Vision System |
|
Anand Shanker Upadhyaya, Prasun Kumar Bandyopadhyay , DRDO |
|
|
Oral 11 |
Evaluation of Ti-Zr-V (NEG) Thin Films for Their Pumping Speed and Pumping Capacity |
|
Tripti Bansod, et.al., Raja Ramanna Centre for Advance Technology |
|
|
Oral 12 |
Pulsed and RF Glow Discharge in Helium Atmosphere |
|
Pooja Gulati, et.al., CSIR-Central Electronics Engineering Research Institute, Pilani |
|
|
Thursday, Feb 16, 2012 |
|
Session 4 (Plenary) |
|
IT – 08 |
Minimizing contamination of SRF niobium cavities for achieving high performance |
|
Ganapati Myneni, Accelerator R&D, Jefferson Lab, Newport News, VA, USA |
|
|
IT – 09 |
The LIGO Vacuum Systems: Challenges and Solutions |
|
Michael Zucker, LIGO Laboratory, MIT, USA |
|
|
IT – 10 |
Activities towards development of a high Intensity proton accelerator for ADS |
|
P. Singh, Bhabha Atomic Research Centre, Mumbai |
|
|
IT – 11 |
Role of IISc in the development of Cryopumps for fusion applications |
|
S. Kasthurirengan, CCT, IISc, Bangalore. |
|
|
IT – 12 |
Turbo Pumps – From Theory to Practice |
|
Andreas Schopphoff , Pfiffer |
|
|
Parallel Session 5A |
|
Oral 13 |
Establishment of a Force Balanced Piston Gauge for Very Low Gauge and Absolute Pressure Measurements at NPL, India, |
|
Arun Vijayakumar, et.al., NPL |
|
|
Oral 14 |
Development and UHV Testing of LN2 Cooled Titanium Sublimation Pump |
|
B. K. Sindal,, et.al., Raja Ramanna Centre for Advance Technology |
|
|
Oral 15 |
Study of Hydrogen Pumping through Condensed Argon in Cryogenic pump |
|
K. A. Jadeja, S. B. Bhatt, Institute for plasma research, Bhat, Gandhinagar |
|
|
Oral 16 |
In- Service Helium Leak Testing of Vacuum Furnace |
|
Anis Ahmad, et.al., QAD, BARC |
|
|
Oral 17 |
Vacuum System in the IN-TF and Optimisation of Pumping Requirements |
|
Rambilas Prasad et.al. presented by A.K. Chakraborty , ITER-India, Institute for Plasma Research |
|
|
Parallel Session 5B |
|
Oral 18 |
Open Loop, Auto Reversing Liquid Nitrogen Circulation Thermal System for Thermo Vacuum Chamber |
|
MCA Naidu, ISRO |
|
|
Oral 19 |
Conceptual Design of Vacuum Chamber for testing of High Heat Flux Components using Electron Beam as a Source |
|
Mohammad Shoaib Khan, et.al., Institute for Plasma Research |
|
|
Oral 20 |
Vacuum System Design for PWT Linac Structure |
|
Saket Kumar Gupta, Sanjay Chouksey, Raja Ramanna Centre for Advanced Technology, Indore |
|
|
Oral 21 |
Development of UHV Compatible Carbon Attenuator Coating on APBN Support Rods for a Helix TWT |
|
Suneeta Arya, Vishnu Srivastava, CEERI |
|
|
Oral 22 |
Vacuum Aspects of ITER Diagnostic Systems |
|
Kaushal Patel, IPR |
|
|
Session 6 (Plenary) |
|
IT – 13 |
The Development of the Unique and Large Cryopump System for the Heating Neutral Beam Injection of ITER |
|
St. Hanke, Karlsruhe Institute of Technology, Karlsruhe, Germany |
|
|
IT–14 |
Development of High Power Vacuum Tubes for Accelerators and Plasma heating |
|
Vishnu Srivastava, CSIR-Central Electronics Engineering Research Institute, Pilani |
|
|
IT – 15 |
Response Time Reduction and Sensitivity Increase during Mass Spectrometric Helium Leak Detection of very large size vacuum systems by Hood Technique |
|
Venkat Ramani, ADITYA High Vacuum Pvt. Ltd., Ahmedbad 382430, Gujrat, India |
|
|
IT – 16 |
Vacuum system for Fusion Devices |
|
S. B. Bhatt, Institute for Plasma Research, Bhat, Gandhinagar, INDIA |
|
|
IT – 17 |
Superconducting e-Linac Project at VECC Kolkata |
|
Vaishali Naik, DAE/VECC, Kolkata, India |
|
|
A. S. Divatia Memorial Lecture |
|
|
|
Friday, Feb 17, 2012 |
|
Session 8 (Plenary) |
|
IT-18 |
Low Energy ECR based Ion Beam Facility at VECC |
|
G. S. Taki et. al. VECC Kolkata |
|
|
IT-19 |
Sustained Performance of 8 MeV Microtron |
|
Ganesh Sanjeev, Microtron Centre, Mangalore University |
|
|
IT-20 |
Technological Aspects of High Power Klystron Development |
|
L. M. Joshi, Central Electronics Engineering Research Institute, Pilani |
|
|
IT- 21 |
Development of Indigenous Electron Beam Machines for Material Processing – Overview of BARC Activity |
|
A. V. Bapat , Bhabha Atomic Research Centre, Trombay, Mumbai |
|
|
IT- 22 |
Electron Linac Development for Radiation Processing and Neutron Production |
|
K.C. Mittal, Electron Beam Center, APPD/ BARC, Mumbai |
|
|
IT-23 |
Formation of nano-patterns by ion beam sputtering |
|
D. Ghose, Saha Institute of Nuclear Physics, Kolkata |
|
|
Session 9 (Plenary) |
|
IT-24 |
ITER Project; Vacuum Vessel and Vacuum Requirements |
|
Kimihiro Ioki , ITER Organization, France |
|
|
IT-25 |
New Approach on vacuum requirement in UHV/XHV systems by Non Evaporable Getter Technology |
|
Enrico Maccallini and Paolo Manini, Saes Getters S.p.a., Viale Italia, Italy |
|
|
IT-26 |
Review and status of dry vacuum pump technologies and their application in High Energy Physics |
|
Murray Liston, Edwards |
|
|
IT-27 |
PECVD/ECR/HWCVD Multichamber System with Robotic Substrate Handling System for Deposition of Thin Film Electronic Devices |
|
P. Rava, Elettrorava s.p.a., Via Don Sapino 176, 10078 Venaria, Torino Italy |